top of page
THE OLD MILL



FINALLY! WORK ON THE INTERIOR BEGINS
After a summer spent building driveways, digging lakes and fencing paddocks we finally turned our attention back to the barn project and...
Nov 14, 2020
Â
Â


FILLING, LANDSCAPING AND FILTRATION
With the liner fully installed work was done on the perimeter of the lake in order to bury the liner overlap in a small trench dug round...
Sep 29, 2020
Â
Â


SO NOW WE'RE GOING TO BUILD A LAKE?
The somewhat incredulous utterance from me when Helen first mooted this latest crazy idea, but... well read on. The far south east corner...
Aug 19, 2020
Â
Â


THE SHEEP ARRIVE AND DEMAND BETTER HOUSING
With the new paddock fence now in place the sheep would have a secure home and therefore in early 2020 two Ouessant lambs were acquired....
Jun 20, 2020
Â
Â


HOW MANY TONNES OF GRAVEL?
With about two thirds of the drive kerbed the 70 tonnes of limestone ordered prior to lockdown was delivered. It came in two loads both...
May 11, 2020
Â
Â
bottom of page